Ashburn Contracting Corporation 42685 Dulles Trade CourtSterling, VA 20166 Monday - Sunday 08:00-19:00 (703) 661-6744

Kirby Rd (Pedestrian Improvements)

from Old Chesterbrook Rd to Hasley Rd, Mclean, VA.

Relocate Existing Watermain in order to install storm drain improvements

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-16.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-13.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-15.jpg?resize=300%2C300

Improve existing storm drainage system along with Filterra Tree Box structure at Kirby Rd infront of Old Chesterbrook Elementary school.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-18.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-17.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-1.jpg?resize=300%2C300

Excavation & preparations to install concrete sidewalk, curb & gutter, handicap ramps & concrete aprons for asphalt driveways.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-3.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-5.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-4.jpg?resize=300%2C300

Backfill, Stabilize & Restore all disturbed areas with topsoil, seed & matting.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-7.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-6.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-6.jpg?resize=300%2C300

Asphalt paving of residential driveways & resurfacing of roadway, project completion.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-10.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-9.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-8.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Kirby-Rd-Sidewalk-Project-11-3.jpg?resize=300%2C300

.