Eagon Hills (BMP Storage Volume)

Storm Water Maintenance Pond Repair, Drainsville, VA

Mobilize to job site, begin clearing of trees & brush to install safety fence with Erosion & sediment controls.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-10.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-11.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-12.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-13.jpg?resize=300%2C300

Begin excavation of existing pond, grade and install emergency spillway to ensure the pond can withstand a “100 year storm.”

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-14.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-15.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-16.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-17.jpg?resize=300%2C300

Installation of a riser structure with a low flow trash rack and wing walls using a crane. 24” RCP from riser structure to end-wall structure and regrade existing outfall with Class I Rip-Rap.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-18.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-19.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-20.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-8.jpg?resize=300%2C300

Final grading and restoration phase of the project. Utilizing topsoil, seed mix & jute mesh. Coir matting used in the wetland to stabilize.

https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-5.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-6.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-3.jpg?resize=300%2C300
https://i0.wp.com/www.ashburncontracting.com/wp-content/uploads/2019/04/Eagons-Hills-Pond-Project-7.jpg?resize=300%2C300